Belgrade waterfront area will, in the final phase, have 2 storm water pumping stations. Pumping station 1 is located next to Tram bridge and has total capacity of 6200 l per second and will be part of the Belgrade water and sewage system. Five high capacity storm water pumps are installed in it. Part of the project is 200 meters of 2000 mm diameter evacuation pipeline.
NBC Univerzing provides the following services for this project:
- Project management
- FIDIC engineer
- Construction and design management
- Costruction supervision
- Health and safety
- Services for processing monthly situations and additional offers during the execution of works